












 |
 |

ILSAC GF-5: WHY
The proposed ILSAC (International Lubricant Standardization and Approval Committee) GF-5 specification is driven by needs expressed by the original equipment manufacturers (OEMs):
- To capture defined improvements in
- Fuel economy
- Fuel economy retention
- Protection of emission control systems
- To service expanding use of new hardware technologies
- Variable valve actuation (VVA)
- Trubochargers
- Spark ignition direct injection (SIDI) engines
- Alternative fuels, particularly E85
- To affect engine oil robustness
- Increased IIIG WPD limit
- Increased VG AES, RCS and decreased OSC limits
- Decreased TEOST MHT limit
ILSAC GF-5: WHAT
ILSAC issued a draft specification – ILSAC GF-5 Standard for Passenger Car Engine Oils – on February 21, 2007, which stipulated:
- Tighter limits
- Phosphorus maximum level reduced from 0.08% to 0.07%
- Sludge (Sequence VG) and deposits (Sequence IIIG Weighted Piston Deposits [WPD])
- TEOST MHT
- Oil screening clogging (Sequence VG)
- Foaming
- New tests
- Phosphorus volatility/retention
- Fuel economy (Sequence VID)
- Rust and emulsion for E85
- Seal compatibility
- Aeration
- ROBO (used oil viscometrics)
ILSAC GF-5: HOW
Following is a comparison of the proposed new specification versus the current ILSAC GF-4 in terms of tighter limits and new tests
ILSAC GF-5: WHEN
The following represents the original timeline for new specification development:

The impact of key items from the ILSAC GF-5 timeline will affect timing:
- Estimated industry funding of GF-5 precision matrices
- Biggest item will be the Sequence VID
- Official timing to run matrices is 2Q/3Q 2008
- Acc estimates cost range for precision matrices at $1.2-1.9M
- ACC estimate of cost range for BOI/VGRA test at $400K=$1M
- Historically, API, ACC and ILSAC split one-third each for precision part of matrix
- Estimate of individual trade association share for precision matrices at $400-620K
- Completion of Sequence VID test development
- Definition of category demonstration oil
- Difficult to define without clearer picture about Gf-5, including chemical limits, and most likely tests and performance limits
- First license date targeted for July 1, 2010
|
 |
|
These PDF files have been optimized for
use with Acrobat Reader 4.0 or higher. You may experience
some error messages when viewing with earlier versions of
the reader. To avoid this we strongly suggest that you upgrade to the latest version.
 |
|
|